Faragas Landfill
To treat the raw leachate from a Romanian municipal solid waste landfill, the following treatment layout has been installed at the Client’s site:
- flow equalization and pH adjustment
- pressurized multimedia granular filtration
- anti-scalant dosing
- cartridge filtration
- spiral-wound RO membrane filtration (first stage)
- CD-RO membrane filtration (second stage)
- CD-RO membrane filtration (third stage)
mft CD-RO modules are essential to maximize the overall recovery rates
Parameter | Unit | CD-RO (second stage) | CD-RO (third stage) |
Feed flow | m³/d | 34.3 | 17.2 |
Feed conductivity | mS/cm | 38.0 | 76.0 |
Permeate conductivity | mS/cm | 2.5 | 5.0 |
Flux at operating temperature | LMH | 5.7 | 4.0 |
Recovery rate | % | 50 | 40 |